Drawings and documents
Published accounts: journal notice
Notice in the monthly list of patents, with remarks
Journal of the Franklin Institute, new ser., vol. 7 (1831), p. 160 · View the page
23. For improvements in the Mode of Building Vessels; William Annesley, Albany, New York, November 6.
Remarks. (See the specification.)
Published accounts: journal notice
Notice in the monthly list of patents, with remarks
Journal of the Franklin Institute, new ser., vol. 7 (1831), p. 179 · View the page
Abstract of the specification of a patent for a new mode of uniting Timber together, so as to combine great strength, compactness, and durability; which is applicable to many purposes in the business of civil architecture and engineering, such as the building of Bridges, Aqueducts, Domes, and many other structures. Granted to WILLIAM ANNESLEY, Albany, New York, November 6, 1830.
Remarks. To all whom it may concern, be it known, that I, William Annesley, of the city of Albany, in the state of New York, have invented a new mode of uniting timber together, so as to combine great strength, compactness, and durability. This invention is applicable to many purposes in civil architecture and engineering, such as the building of bridges, aqueducts, domes, and many other structures. The general principle upon which I proceed being the same as that which is detailed in a specification or description of my mode of "building boats, and sea vessels;" for which I have applied to obtain letters patent of the United States, in an instrument of writing bearing date with the present. And I do hereby declare that the following is a full and exact description of my said invention, and of the manner in which it may be carried into effect. For the purpose of exemplification I have chosen a "groined arch bridge," an "aqueduct," and a "dome;" not, however, intending to restrict myself to these in the application of my invention, the essential feature of which is the forming of the structure, whatever it may be, by uniting together two, three, or more thicknesses, or layers, of plank or boards, some of which layers cross the others transversely; the whole being bent, or formed upon moulds, and closely united together, so as to be impervious to water, and to retain the shape given to them, after the mould by which it has been determined, is removed. For a bridge, abutments are to be built in the usual way, and sills of the most durable timber being placed three or four feet from the faces of the abutments, are levelled to the curve of the arch, and firmly built in with stone and mortar. Uprights of suitable lengths, and at convenient distances apart, are fixed in the bed of the river, and properly braced, they rising to the height necessary for supporting the intended arch. The curve of the arch having been marked ANNESLEY'S mode of Uniting Timbers together. on these uprights, they are to be cut off fair to these marks. The first course of outside string pieces, are then laid, and fastened to the tops of the uprights by iron clamps and wood screws, which are afterwards to be drawn. This first course may be 10 or 12 inches in width, and four in thickness. A second plank course, of the same dimensions, is then laid on, breaking joints with the first. The arched transverse beams are then fixed in their places, and filled in between in two courses, as shown by the dotted lines; the upper one being trimmed to the transverse curve. These are all to be fastened together with oak pins. The first course of the centre string is now laid on and pinned to the beams, and the second laid flush with the beam and pinned. On these I commence laying my first course of groin arch, of two inch pine, using the longest plank which I can obtain. They are all made truly to a width, and bevilled to fit the transverse curve, and fastened to the beams with long cut nails. The next course of plank is laid athwart, pine 14 inch in thickness will answer. The third course may be 2 inches in thickness; a fourth transverse course, similar to the second, is then laid, and this is followed by the fifth, or last course. In laying this upper course longitudinally, the jointed edges of the plank should be coated with good white lead paint. The seams are afterwards to be wedged, in the manner described in the specification of my mode of " building boats and sea vessels." The last plank being 2 inches, the wedges should be 24 inches long, 3-10 thick at the back, and 1-10 at the edge; those which I have used were 4 inches wide, and were made of poplar, (white wood.) The seams are to be opened, as for caulking, the wedges dipped in white lead paint, and driven home, so as to clinch upon the transverse timber below. The cut nails used may be preserved from rust by heating them red hot, and plunging them in fish oil; and between each course of planking, the whole surface should be payed over with pitch and oil, or some similar article; oiled paper also should be interposed throughout, between every layer, or course, of plank. My plan of uniting timber may be applied to aqueducts, either open or close. When it is desired to erect an aqueduct at once in its proper place, a scaffolding must be raised to support it, as in bridge building. Aqueducts may also be built in sections, and these afterwards elevated, and united together. The mode of procedure being generally the same with that followed in the building of bridges, I deem it unnecessary again to go into details.
About this record
- Patentee
- the Journal of the Franklin Institute, Journal
- Date
- the Name and Date index of patents, Jim Shaw's X-patent list
- Invention
- the Name and Date index of patents
- Listed in
- the Name and Date index of patents, Jim Shaw's X-patent list, the Journal of the Franklin Institute, Burke's List of Patents (1847)
- The patentee's full name comes from the Franklin Institute's journal.
- in_burke